Current Construction Projects
Manhole Inspection Program
As part of our ongoing sanitary sewer system maintenance, Bloomfield Township performs inspections on our sanitary manholes on a five-year cycle. Starting on May 5th, 2026, and continuing throughout the summer, field crews from our consultant, Hubbell, Roth, and Clark, Inc. (HRC), will be working in District 3 (pictured here). 
They will be locating and inspecting manhole structures including some structures placed in easements located in side and rear yards. It is not the Township’s intention to bring heavy equipment into yards or perform any construction at this time. Every effort will be made to minimize impacts to the community and, regardless of the location, any disturbed areas will be restored. All field crews will have identification badges.
Project Contacts
Should you have any concerns or questions about the project, please notify the Project Engineer or Bloomfield Township Engineering and Environmental Services Department.
Bloomfield Township
Paul Horen
4200 Telegraph road
Bloomfield Hills, MI 48303
248-433-7732
phoren@bloomfieldtwpmi.gov
Hubbell, Roth & Clark ( HRC )
Justin Van Acker
555 Hulet Drive
Bloomfield Hills, MI 48302
248-762-6430
jvanacker@hrcengr.com
Hubbell, Roth & Clark ( HRC )
Chris Ross, PE
555 Hulet Drive
Bloomfield Hills, MI 48302
248-330-7344
cross@hrcengr.com
Red Maple Lane – Luz Relief Drains Extension
This project will improve drainage in the vicinity of Red Maple Lane, including Maple Road, by extending the Luz Relief Drains. Construction will begin in summer of 2026 and last several months. The scope of work includes:
- The construction of approximately 1,203 feet of 12, 18, and 24 inch reinforced concrete storm drain with associated manholes, catch basins, and other structures.
- Minor ditching to ensure drainage to the new structures.
- Regrading the existing gravel surface on Red Maple Lane.
This extension under Chapter 20 of the Drain Code, Public Act No. 40 of 1956, allows the construction of drainage systems, improvements, and maintenance and operation to fall to the Drain Board, via the Oakland County Water Resource Commissioner’s office (OCWRC). Additionally, the capital costs and maintenance costs will be shared by the Township and Oakland County.
Project Contacts
Should you have a concern or question about the project, please notify the Project Engineer or Bloomfield Township Engineering and Environmental Services Department.
Bloomfield Township
Mark Hendricks
4200 Telegraph road
Bloomfield Hills, MI 48303
248-200-6814
mhendricks@bloomfieldtwpmi.gov
Hubbell, Roth & Clark ( HRC )
Justin Van Acker
555 Hulet Drive
Bloomfield Hills, MI 48302
248-762-6430
jvanacker@hrcengr.com
Oakland County Water Resources Commissioner’s (OCWRC)
Mike Walsh
One Public Works Drive, Bldg. 95 West
Waterford, MI 48328
248-431-4180
walshm@oakgov.com
2026 Sewer Rehabilitation Program
Bloomfield Township is set to resume its ongoing public sanitary sewer system rehabilitation program in the Fall of 2026. The main goal of this is to reduce inflow and infiltration of groundwater into our system. This will decrease the overall volume of sewage requiring treatment, save money, and lower the risk of sanitary sewer overflows.
In coordination with Oakland County Water Resources Commissioner’s Office, the Township prioritized portions of sections 12, 13, 24, and 25 (see map). Following a comprehensive investigation completed in 2025, the Township identified specific mainline sanitary sewers and sewer manholes requiring attention. This will include cleaning of the sewers, grouting of joints, and installing a Cured in Place Piping (CIPP) liner. Because it avoids excavation, the installation of CIPP liners will greatly reduce ground disturbance and the associated restoration, minimizing the impact to the community.
Important Notice Regarding Home Sump Pumps
During the CIPP lining process, the connection where each home’s private sewer line discharges to the public sanitary sewer will be temporarily blocked for several hours. If a home's sump pump is connected to the sanitary sewer lead, there is a serious risk of water backing up into the basement while the pipe is blocked.
What you need to do:
If you know or suspect that your sump pump is tied into your sanitary sewer lead, please contact the Township’s Engineering and Environmental Services Department immediately. We need to investigate this and resolve any connections before the CIPP lining begins to protect your property from damage.
Project Area

Project Contacts
Should you have any concerns or questions about the project, please notify the Project Engineer or Bloomfield Township Engineering and Environmental Services Department.
Bloomfield Township
Cory Borton
4200 Telegraph road
Bloomfield Hills, MI 48303
248-594-2809
cborton@bloomfieldtwpmi.gov
Hubbell, Roth & Clark ( HRC )
Chris Ross, PE
555 Hulet Drive
Bloomfield Hills, MI 48302
248-330-7344
cross@hrcengr.com